In Paris, there is almost no new building any more: there is transformation.

Adding storeys to a building, filling a gap site, changing the use class of an office floor, renovating a hôtel particulier (private mansion): every project takes place on land that is already built up, in a protected urban fabric, under the watchful eye of organised neighbours.

Since the bioclimatic PLU (local urban development plan) came into force on 29 November 2024, the rules of the game have changed on almost all these fronts at once.

Maître Laurent Bidault advises developers, investors, hoteliers, co-ownership associations and local residents across all twenty arrondissements, in both advisory and litigation matters, in planning law.

The bioclimatic PLU, the new arbiter of Parisian projects

Approved by resolution of the Conseil de Paris of 20 November 2024 and enforceable since 29 November 2024, the bioclimatic PLU applies to every application filed since that date. A project designed under the former PLU must be re-examined before filing: several of its foundations have disappeared.

Rebalancing housing and employment: the SPH / SPE distinction

The regulations now reason in terms of residential floor area (SPH) and economic floor area (SPE). In the housing development sectors, in central and western Paris, economic floor area can no longer increase, except within a limited margin where the project creates housing. Conversely, large-scale office projects must include a share of housing.

For an investor, it is the financial balance of the project that changes, not just its building envelope.

Reserved sites and social mix requirements

The bioclimatic PLU has greatly increased the number of sites reserved for social housing or for bail réel solidaire (shared-equity leasehold), targeting primarily the arrondissements with a shortfall. On top of this come social mix requirements, whose rate varies according to the classification of the arrondissement and whose trigger threshold has been lowered.

Two very practical consequences: a building can be “earmarked” without its owner's knowledge, and the right of abandonment (droit de délaissement) becomes a negotiating tool in its own right.

Protecting existing buildings: demolition, protected buildings, unsealed ground

The protection of existing buildings and the requirements for unsealed ground (pleine terre) and greening are the other two pillars of the regulations. They now account for a growing share of refusals in Paris: refusals to demolish, refusals of building footprint, requirements concerning courtyards and roofs.

These grounds can be challenged, provided the error of assessment is established from the informal appeal or the application to the court onwards.

In Paris, the building permit is never the only authorisation

A Parisian project rarely faces just one procedure. The most costly oversights concern authorisations that accumulate.

Office approval, specific to the Île-de-France region

Above 1,000 m² of office floor area created or changed in use, the prefectoral approval provided for in article L. 510-1 of the Code de l'urbanisme (French Planning Code) is essential. Since 1 November 2025, applications have been examined in light of guidelines published by DRIEAT Île-de-France, which favour renovation and tackling office vacancy. On top of this comes the levy on the creation of offices and commercial premises (article L. 520-1 of the same code), to be factored into the financial balance from the outset.

The opinion of the Architecte des Bâtiments de France

Surroundings of historic monuments, remarkable heritage site, the Marais safeguarding and enhancement plan: in Paris, the opinion of the ABF (the state heritage architect) is often binding, and therefore decisive. An unfavourable ABF opinion is nevertheless not the end of the road.

Change of use

Turning a home into furnished tourist accommodation or professional premises requires an authorisation separate from planning law, with compensation required in Paris. This regime was tightened by the law of 19 November 2024 on furnished tourist accommodation.

Commercial operating authorisation

Where the project creates or extends a retail area, the procedure before the commission départementale d'aménagement commercial (departmental commercial planning committee) is added to, or merged with, the permit application.

Five situations in which we act in Paris

1. Adding storeys, filling gaps, densifying. Checking the remaining building potential on the basis of the regulations published on the Géoportail de l'urbanisme, building envelope, courtyard and view easements, approval from the co-ownership, preparing the file for the ABF.

2. Converting offices into housing or a hotel. Coordinating the change of use class, the office approval, the social mix rules and, where applicable, the levers of building reversibility.

3. Challenging a refusal or a deferral of decision (sursis à statuer). Analysis of the grounds, informal appeal where it remains useful, application on the merits, interim suspension proceedings (référé-suspension).

4. Defending a challenged permit. In Paris, challenges most often come from a co-owners' association (syndicat de copropriétaires) or a residents' association: challenging standing to bring proceedings, regularisation during the proceedings, structured negotiation.

5. Regularising. Works carried out without a permit, unauthorised division, undeclared change of use: assessment of the administrative and criminal risk, followed by a strategy for returning to compliance.

Litigation decided only once

Planning challenges against Parisian projects fall within the jurisdiction of the tribunal administratif de Paris (Paris administrative court). However, as Paris is classified as a high-pressure housing area (zone tendue), article R. 811-1-1 of the Code de justice administrative (French Code of Administrative Justice) removes the right of appeal, until 31 December 2027, for challenges against permits to build or demolish a building comprising more than two dwellings, against permits to develop a housing subdivision and decisions not to oppose a prior declaration authorising a subdivision, as well as against refusals of such applications. Since decree no. 2026-302 of 21 April 2026, which came into force on 1 July 2026, this removal of the right of appeal no longer applies to authorisations relating to the planning and development operations for the 2030 Winter Olympic and Paralympic Games, nor to those for operations of national interest and major urban development operations. The court rules at first and last instance; the only remaining remedy is an appeal on points of law to the Conseil d'État.

In other words: in Paris, the first instance is the only one. The selection of grounds, the quality of the technical expertise produced and the preparation of any regularisation (articles L. 600-5 and L. 600-5-1 of the Code de l'urbanisme) must be settled from the filing of the application or the first statement of defence, as the grounds are frozen two months after the latter is communicated.

Acting across all twenty arrondissements

The firm is based in the 10th arrondissement and acts throughout Paris: office projects in the 8th, 9th and 17th, the protected fabric of the Marais and the Île Saint-Louis, hotel projects from the 1st to the 6th, housing and urban renewal projects in the 13th, 18th, 19th and 20th.

Many Parisian projects extend beyond the périphérique ring road: our overview of planning law in Paris and Île-de-France covers all eight départements, starting with Hauts-de-Seine and Seine-Saint-Denis.

Ils ont fait appel à NOVLAW avocats

Chargement…

Frequently asked questions on

Planning law

What is the time limit for lodging an appeal on points of law against a judgment of an Administrative Court of Appeal?

The time limit for lodging an appeal on points of law (pourvoi en cassation) against a judgment of an Administrative Court of Appeal is two months from notification of the court's decision. However, this time limit is reduced to 15 days where the case concerns summary proceedings (référé).

How can a building permit be challenged?

A building permit is challenged before the administrative court, by means of an application for judicial review (recours pour excès de pouvoir), within two months from the first day of a continuous two-month period during which the notice has been properly displayed on the site. If the notice was displayed irregularly or not at all, a challenge remains possible for six months from completion of the works. Two admissibility conditions must be met: the applicant must demonstrate standing, i.e. a direct impact on the conditions of occupation, use or enjoyment of their property; and the challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being filed, by registered letter with acknowledgement of receipt. An informal appeal (recours gracieux) to the mayor remains possible, within one month, but it no longer extends the time limit for bringing proceedings for decisions taken on or after 28 November 2025 (Article L. 600-12-2 of the French Planning Code, introduced by the law on simplifying planning law of 26 November 2025). You should therefore not wait for the town hall's response before applying to the court. An application for suspension (référé-suspension) may be brought alongside the action on the merits to have the works halted.

What remedies are available against a building permit or prior declaration?

Third parties with standing, such as neighbours or associations, have two months from the first day of a continuous period of proper display of the notice on the site to apply to the administrative court. Two procedural rules determine admissibility: the challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being filed, and standing must be established in detail. A decisive strategic point: since the law on simplifying planning law of 26 November 2025, an informal appeal (recours gracieux) no longer extends the time limit for bringing proceedings before the court for decisions taken on or after 28 November 2025. Waiting for the town hall's response therefore exposes you to the risk of being time-barred. Alongside the action on the merits, an application for suspension (référé-suspension) can be made to have the works halted.

What remedies are available against a refusal of a building permit?

Any refusal must state its legal and factual grounds. The first step is to analyse those grounds to determine whether they can be challenged in law or whether they reveal an obstacle that could be removed by amending the project. An application for judicial review (recours pour excès de pouvoir) must be lodged with the administrative court within two months of notification of the refusal. If the refusal is annulled, the court may order the administration to re-examine the application and, where the project complies with planning rules, to grant the authorisation. A point to watch: since the law on simplifying planning law of 26 November 2025, an informal appeal (recours gracieux), which must now be lodged within one month, no longer extends the time limit for bringing proceedings before the court. For decisions taken on or after 28 November 2025, you must apply directly to the court, or lodge both appeals at the same time.

What is the time limit for appealing a decision of an administrative court?

The time limit for appealing a decision of an administrative court (tribunal administratif) is two months from notification of the judgment. This time limit is only 15 days if the decision is an interim relief order (référé).

What is the right of retrocession?

If the local authority wishes to change the purpose or use of the property within 5 years of its acquisition, it must inform the former owner and offer them priority to acquire it. If the former owner declines, the local authority must inform the ousted prospective buyer named in the declaration of intention to sell (déclaration d'intention d'aliéner), and offer them priority to acquire the property.

What is the right to compel purchase (droit de délaissement)?

The right to compel purchase (droit de délaissement) is the right given to the owner of a property subject to a public utility easement (a reserved site in the local urban plan or PLU, an expropriation zone) to require the public authority to purchase the property. This right enables the owner to escape a deadlock caused by the public constraint weighing on their property. The authority then has one year in which to decide on the acquisition.

What is a carte communale?

The carte communale (municipal land-use map) is the equivalent of the PLU (local urban plan) for small municipalities that have chosen not to adopt one. It defines the areas where building is permitted, as well as the public utility easements affecting land use.

What is the commercial pre-emption right?

The commercial pre-emption right is a tool available to municipalities to combat the decline of town centres and ensure that local shops are maintained. The purpose of this pre-emption right is therefore to maintain or reintroduce diversity in local economic activity.

What is a prior declaration of works?

The prior declaration of works (déclaration préalable de travaux) is a planning authorisation that must be obtained before smaller-scale works begin. It is less demanding than a building permit and covers less significant construction and works. This declaration is mandatory and largely shares the procedural requirements of the building permit.

What is a building permit?

A building permit is a planning authorisation that must, in most cases, be obtained before works begin, whether to build, demolish or alter a structure, regardless of the type of owner or structure. It generally concerns new constructions and major alterations to existing buildings.

What is a SCOT?

The SCOT (Schéma de cohérence territoriale, territorial coherence scheme) is a long-term strategic inter-municipal planning document covering an urban area or a large living or employment area. It incorporates all higher-level planning documents; PLUs, PLUis and cartes communales therefore refer directly to the SCOT.

Can the municipality exercise its right of pre-emption?

Yes. If your property is located in a pre-emption zone (DPU), the municipality can take the place of the buyer when the Declaration of Intention to Sell (Déclaration d'Intention d'Aliéner, DIA) is signed. However, this decision must be strictly justified by a genuine development project in the general interest. We can assist you in challenging the lawfulness of the pre-emption or in negotiating the sale price before the expropriation judge.

Is a building permit required for a relay antenna?

A relay antenna requires a prior declaration where its footprint and floor area exceed 5 m² but do not exceed 20 m². A building permit is required if the antenna's footprint or floor area exceeds 20 m², or if the antenna is located within the boundaries of remarkable heritage sites (sites patrimoniaux remarquables) or in the vicinity of historic monuments and listed sites.

How can you ensure that a project complies with the PLU?

Before submitting an application, our firm carries out a thorough audit of your project against the rules of the Local Urban Plan (PLU) (zoning, height, footprint, parking). We can also apply for a planning certificate (certificat d'urbanisme, either detailed or informational) to freeze the rules applicable to your land.

What are the requirements for displaying a building permit?

Display on the site is mandatory whatever the operation, and whether the permit was granted expressly or tacitly. It takes the form of a rectangular sign visible from the public road, the content of which is set by the French Planning Code: identity of the beneficiary, date and number of the permit, nature of the project, area of the land, authorised floor area, height of the building, address of the town hall where the file can be consulted, and details of the means and time limits for challenging it. What is at stake is triggering the time limit for third-party challenges, which runs from the first day of a continuous two-month display period. Incomplete or interrupted display does not start that time limit running and leaves the project exposed to a late challenge: it is strongly advisable to have a commissaire de justice (judicial officer) draw up official reports at the beginning, during and at the end of the period.

What is the time limit for challenging a building permit?

Third parties have two months from the first day of a continuous two-month period of proper display of the sign on the site. Where the display was irregular or did not take place, this time limit does not run: a challenge remains possible for six months from completion of the works. Two points are decisive in practice. The challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being lodged, failing which it will be inadmissible. And, for decisions taken on or after 28 November 2025, a request for reconsideration (recours gracieux) no longer extends the time limit for bringing court proceedings: you must therefore not wait for the town hall's response before applying to the administrative court.

What is the right of pre-emption?

The right of pre-emption is the power given to a local authority (or to a dedicated body) to acquire, as a priority and within certain previously defined areas, property being disposed of, with a view to carrying out operations in the public interest.

Is it compulsory to use an architect for a building permit?

Using an architect is the rule for any building permit application. The only notable exemption applies to individuals who build, or have built, for themselves a building whose floor area does not exceed 150 m², a threshold raised to 800 m² for agricultural buildings. A point often overlooked: this exemption does not apply to legal entities. A property holding company (SCI), including a family one, a property development company or a local authority must use an architect whatever the size of the project, failing which the application will be inadmissible.

Do you need a building permit for a conservatory (véranda)?

It depends on the area created and the location of the land. A conservatory is an extension: in an urban zone of a municipality covered by a PLU (local urban development plan), a prior declaration is sufficient up to 40 m² of floor area or footprint, and a building permit becomes mandatory above that. Everywhere else, the threshold is lowered to 20 m². Please note: in an urban zone, a building permit is again required from 20 m² where the extension brings the total floor area of the building above 150 m².

Do you need a building permit for a garage?

It depends on the size of the garage and its location. If it is attached to the existing building, it is an extension: prior declaration up to 40 m² in an urban zone of a municipality covered by a PLU, up to 20 m² elsewhere, and a building permit above that. If it is a detached garage, it is a new construction: no formalities up to 5 m², prior declaration from 5 to 20 m², building permit above 20 m². In an urban zone, a building permit is also required from 20 m² if the works bring the total floor area above 150 m².

Do you need a building permit to convert an attic?

Converting an attic is only subject to authorisation if it creates floor area or alters the external appearance of the building, for example by adding a roof window or a dormer. Where this is the case, a prior declaration is sufficient up to 40 m² of floor area created in an urban zone of a municipality covered by a PLU, and up to 20 m² elsewhere; above that, a building permit is required. In an urban zone, a building permit is also required from 20 m² if the works bring the total floor area of the building above 150 m².

How much does a building permit cost?

Filing the application is free: the town hall does not charge any processing fee. The real cost of a building permit lies in three items. First, planning taxes, chief among them the development tax (taxe d'aménagement), assessed on the taxable area using a flat-rate value per square metre revised each year, to which the rates voted by the municipality and the département apply; in Île-de-France, an office, retail or warehouse project is also subject to the charge for the creation of premises (redevance pour création de locaux). Second, design and project management fees, which vary according to the nature and complexity of the project. Finally, where applicable, the preventive archaeology levy. These items must be costed from the outset in the development appraisal: the development tax often represents an amount out of all proportion to the application costs.

What is the PLU?

The local urban development plan (Plan local d'urbanisme, PLU) sets the planning and building rules by dividing the territory into plots and zones with distinct legal regimes. For each plot, it shows the applicable planning rules as well as easements, access to utility networks and to the public road, and whether or not the plot can be built on.

Do you need a building permit for a swimming pool?

No, in most cases. A pool with a surface area of 10 m² or less is exempt from any formalities, except in a protected area. Between 10 m² and 100 m², a prior declaration is sufficient. A building permit is only required for a pool of more than 100 m². It is also required, whatever the surface area of the pool, where the pool is covered by a shelter more than 1.80 metres high. These thresholds do not exempt the project from complying with the PLU, which may lay down its own rules on siting, setbacks and footprint.

How can the designated use (destination) of a property be changed?

A change of designated use requires, at a minimum, a prior declaration. If the accompanying works alter the load-bearing structures or the façade of the building, a building permit is required. Two useful points. The French Planning Code distinguishes five uses and twenty sub-uses: moving from one sub-use to another within the same use is not, in itself, a change of use requiring authorisation, although the PLU may regulate it. In addition, certain changes of use are subject to a binding opinion, in particular that of the CDPENAF (commission for the preservation of natural, agricultural and forest areas) for a building located in an agricultural zone.

How can a pre-emption decision be challenged?

The owner and the ousted buyer may attempt to challenge the pre-emption decision. Before bringing litigation, it is possible to lodge a prior informal appeal (recours gracieux) with the holder of the pre-emption right within 2 months of notification of the decision. If the informal appeal is rejected by the holder, a contentious appeal must then be lodged with the administrative court within 2 months.

Explore all our resources
No items found.

In Paris, a refusal must be challenged within two months

And since 28 November 2025, lodging an informal appeal (recours gracieux) with the town hall no longer extends this time limit: court proceedings must be brought in parallel. Between heritage protections and the bioclimatic PLU, the strategy is built from the moment the decision is notified. Get in touch without delay.