Construction law covers all the legal rules governing every stage in the creation of a building or structure, from design to handover, as well as the liabilities of the various parties involved. It is a branch of private law, attached to civil law and more specifically to real estate law.
Construction law is divided into two main branches:
Private construction law:
It governs relations between the various private parties involved in a construction project: the project owner (owner, developer), the project manager (architect, engineering firm) and construction companies.
It covers in particular the drafting and performance of contracts (project management contracts, works contracts, off-plan sales (VEFA), building leases, BEFA, emphyteutic leases, property development contracts), builders’ liability for defects or delays, construction insurance, etc.
Public construction law:
It covers planning rules and the administrative authorisations required to build (building permits, prior declarations of works, planning certificates).
It also deals with building safety, health and accessibility rules.
Finally, and above all, it covers contracts, in particular public works contracts.
A lawyer specialising in construction law plays a crucial role in supporting clients and defending their interests throughout a construction project, whether at the planning stage, during the works or after handover.
The lawyer’s work may include the following:
{{cta-inject-1}}
Construction works can cause damage, typically in the form of cosmetic defects, equipment malfunctions or defects affecting structures more broadly, including those of neighbouring buildings. Let NOVLAW Avocats assist you with a référé préventif to protect yourself against such damage.
The référé préventif is a procedure that allows project owners to anticipate the consequences of damage that construction works may cause to neighbouring buildings, and to protect themselves against unfounded compensation claims that might be brought against them.
The référé préventif is brought before the tribunal judiciaire (civil court) before the works begin. The President of the court is asked, in summary proceedings, to appoint a court expert who will visit the project site to record the condition of the site and of the buildings neighbouring the future works. The record of condition drawn up by the expert will help you avoid any dispute over the prior condition of neighbouring buildings once the works are completed. The court expert may also recommend any protective and preventive measures needed to prevent damage that the planned works might cause.
A construction project is a large-scale undertaking requiring the involvement of several contractors and subcontractors. The parties involved are professionals from various building trades.
The most common are the project manager, architects, construction companies and various technical specialists.
A subcontractor, for its part, is a contractor to which a main contractor entrusts all or part of the works it was due to carry out.
To secure your works and ensure a good working relationship with your contractors and subcontractors, it is essential that construction processes, deadlines, the tasks of the various contractors and subcontractors and their responsibilities be set out in contracts drafted by a professional before the construction project begins.
To this end, NOVLAW Avocats draws on its expertise to help you draft your contractors’ and subcontractors’ contracts, taking your situation into account and protecting your interests as fully as possible.
We apply the rigorous contractual engineering needed to protect your projects.
In construction law, acceptance of works (réception) is the process by which the project owner accepts, with or without reservations, the works carried out by the contractor and the works companies.
It must result from the project owner’s unequivocal intention to accept the works.
Acceptance of the works brings the construction contract between the project owner and the builder to an end, and marks the starting point of all the statutory warranties available to the project owner.
Acceptance of the works does not always proceed amicably.
It is often the source of numerous disputes.
To help you avoid disputes or manage them where necessary, we can support you throughout the acceptance process, in particular by attending acceptance meetings with you and supporting you in amicable and contentious proceedings.
Several warranties allow builders to be held liable after acceptance of the works. Essentially, the following liabilities can be distinguished:
If you notice defects after your building has been handed over, NOVLAW Avocats, with its command of the various construction warranties and the procedures for enforcing them, can assist you in asserting your rights and obtaining compensation for your loss.
There is no compulsory BIM policy, but standard policies do not always cover the risks specific to the process: the BIM management role, loss or corruption of the model, damage to data hosted on the collaborative platform, infringement of intellectual property rights. Checks on insurance certificates should therefore focus on three points: the effective insurability of the contractor's BIM role, the existence of professional liability cover for non-consequential intangible loss, and cyber cover for the common data environment.
No, not as such. The ten-year guarantee under Article 1792 of the Civil Code covers damage affecting a construction work that compromises its soundness or renders it unfit for its intended purpose: a digital model is not a construction work, and a mere modelling inconsistency with no physical manifestation does not fall within this regime. On the other hand, a design error revealed by the model and materialised in the completed building falls squarely within the builders' statutory guarantees. The model therefore changes not so much the liability regime as the way in which the defect and the party responsible for it are proven.
The project manager (maître d'œuvre: architect, engineering consultancy) is responsible for the design and supervision of the works. They may be held liable: for 10 years for defects covered by the ten-year guarantee (garantie décennale); for 2 years for defects covered by the two-year guarantee (proper functioning of separable equipment); at any time for design or supervision faults that have caused loss. Bringing a claim against the project manager often requires a prior court-appointed expert assessment to establish liability.
The ten-year guarantee (garantie décennale) is a statutory liability borne by every builder (contractor, architect, project manager) for 10 years from acceptance of the works. It covers damage that compromises the structural integrity of the building or renders it unfit for its intended purpose (serious cracks, water ingress, collapses). To invoke it, the project owner must send the builder concerned a formal notice by registered letter describing the defects, then bring proceedings before the judicial or administrative court if the builder does not comply with the request.
The completion guarantee (garantie de parfait achèvement) is a statutory obligation that runs for one year from acceptance of the works. During this period, the contractor is required to remedy all defects reported by the project owner, whether noted at acceptance or having appeared during the following year. This guarantee applies regardless of fault-based liability.
The référé expertise is an urgent court procedure for obtaining the appointment of a court expert to record construction defects, determine their causes and identify who is liable, even before proceedings on the merits are brought. It is advisable to use it as soon as significant defects appear, in particular to preserve evidence and avoid claims becoming time-barred. The court expert's assessment generally serves as the basis for amicable negotiations or subsequent legal action.
Decennial insurance is compulsory civil liability insurance for any builder (contractor, architect, project manager, engineering consultancy) involved in a construction project. For 10 years from acceptance of the works, it covers damage that compromises the structural soundness of the building or renders it unfit for its intended purpose. It must be taken out before work starts on site, failing which criminal penalties apply.

Construction law: defects, delays, building site disputes. Defend your rights and secure your construction projects effectively.