Bordeaux concentrates, within a single territory, almost all the tensions of contemporary planning law.
A metropolis with strong population growth that must densify its existing urban fabric. A classified vineyard whose land is protected from urbanisation. An Atlantic coastline subject to the loi Littoral (Coastal Act) and, from Soulac to Lacanau, to coastal retreat that is upending what can be built. An extensive flood risk along the Garonne and the Dordogne, and a wildfire risk that recently made itself felt in the Landes.
On top of this comes the trajectory towards land sobriety, which makes every square metre of newly artificialised land harder to justify.
Whether you are a developer in Bordeaux or Bayonne, a wine estate owner, a tourism operator around the Arcachon Bay or a manufacturer in Mérignac, a building permit refusal or a third-party appeal can bring your project to a standstill. Laurent Bidault brings his expertise in planning law to projects in Nouvelle-Aquitaine.
Acting in Gironde requires a command of the Bordeaux Métropole intermunicipal local plan (PLUi) and the planning documents of neighbouring intermunicipal bodies, all available on the Géoportail de l'urbanisme, as well as the easements and risk prevention plans listed on Géorisques.
The firm defends your authorisations before the tribunal administratif de Bordeaux (Bordeaux Administrative Court), and then before the cour administrative d'appel de Bordeaux (Bordeaux Administrative Court of Appeal), whose jurisdiction also covers the courts of Limoges, Pau and Poitiers as well as the courts of the French Antilles and French Guiana (Article R. 221-7 of the code de justice administrative). We also act in Guadeloupe, Martinique and French Guiana.
A procedural point to know before any litigation in Bordeaux. As Bordeaux is one of the municipalities listed in Article 232 of the code général des impôts, Article R. 811-1-1 of the code de justice administrative removes the right of appeal, until 31 December 2027, for challenges to permits for buildings with more than two dwellings and to permits to develop a housing estate. The court then rules at first and last instance. However, the same article excludes from this rule authorisations relating to operations of national interest and major urban development operations: within the Bordeaux Euratlantique perimeter, an appeal therefore remains available. The litigation strategy differs on either side of this boundary.
Is the town hall objecting on the grounds of insufficient green space, poor integration into the fabric of traditional échoppe houses, the protection of wine-growing land or land sobriety objectives? We audit the substantive legality of the decision, manifest error of assessment or misreading of the local plan (PLU), and its procedural legality. We file an informal appeal (recours gracieux) where it remains useful, followed by a court challenge.
This is the most cost-effective intervention. Before filing, we identify weaknesses in the light of the local plan, easements and risks, and then adjust the application. An operational planning certificate also makes it possible to freeze the rules applicable to the land.
Works without authorisation, an official report of an offence, the threat of demolition: we conduct your defence and consider the best regularisation strategy.
This is the distinctive feature of Aquitaine. Beyond the traditional rules of the loi Littoral, the hundred-metre strip, continuity of urbanisation and remarkable areas, the coasts of Gironde and the Landes are subject to erosion that leads to exposure maps and sometimes abrupt restrictions on building. We defend the projects concerned, including a simple house extension in a coastal area.
Building in wine-growing areas comes up against the protection of land classified as AOC. We defend projects for wine cellars (chais), farm buildings and wine tourism reception facilities, by demonstrating that they are necessary for the agricultural activity, and we act in litigation over the right of pre-emption exercised over such land.
Around Mérignac and along the motorway corridors, the extension of industrial sites often falls under the regulations on classified installations (ICPE). We defend these permits in a context of increasingly scarce land for economic use.
Nouvelle-Aquitaine is one of France's leading regions for solar power. We act on ground-mounted solar farms, agrivoltaics, anaerobic digestion units and the roll-out of mobile phone masts, which require prior declarations that are frequently challenged. See our dedicated page on energy and infrastructure law.
The centre of Bordeaux is a UNESCO World Heritage Site and is largely covered by heritage protections. A project there often turns on the opinion of the Architecte des Bâtiments de France (the State heritage architect). We defend your application against an excessive or legally unfounded unfavourable opinion.
Laurent Bidault acts throughout Gironde (33), in Bordeaux, Arcachon, Libourne and Mérignac, the Landes (40) and the Pyrénées-Atlantiques (64), in Bayonne, Anglet, Biarritz and Pau, as well as in the Dordogne, Lot-et-Garonne and Charente-Maritime.
The time limit for lodging an appeal on points of law (pourvoi en cassation) against a judgment of an Administrative Court of Appeal is two months from notification of the court's decision. However, this time limit is reduced to 15 days where the case concerns summary proceedings (référé).
A building permit is challenged before the administrative court, by means of an application for judicial review (recours pour excès de pouvoir), within two months from the first day of a continuous two-month period during which the notice has been properly displayed on the site. If the notice was displayed irregularly or not at all, a challenge remains possible for six months from completion of the works. Two admissibility conditions must be met: the applicant must demonstrate standing, i.e. a direct impact on the conditions of occupation, use or enjoyment of their property; and the challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being filed, by registered letter with acknowledgement of receipt. An informal appeal (recours gracieux) to the mayor remains possible, within one month, but it no longer extends the time limit for bringing proceedings for decisions taken on or after 28 November 2025 (Article L. 600-12-2 of the French Planning Code, introduced by the law on simplifying planning law of 26 November 2025). You should therefore not wait for the town hall's response before applying to the court. An application for suspension (référé-suspension) may be brought alongside the action on the merits to have the works halted.
Third parties with standing, such as neighbours or associations, have two months from the first day of a continuous period of proper display of the notice on the site to apply to the administrative court. Two procedural rules determine admissibility: the challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being filed, and standing must be established in detail. A decisive strategic point: since the law on simplifying planning law of 26 November 2025, an informal appeal (recours gracieux) no longer extends the time limit for bringing proceedings before the court for decisions taken on or after 28 November 2025. Waiting for the town hall's response therefore exposes you to the risk of being time-barred. Alongside the action on the merits, an application for suspension (référé-suspension) can be made to have the works halted.
Any refusal must state its legal and factual grounds. The first step is to analyse those grounds to determine whether they can be challenged in law or whether they reveal an obstacle that could be removed by amending the project. An application for judicial review (recours pour excès de pouvoir) must be lodged with the administrative court within two months of notification of the refusal. If the refusal is annulled, the court may order the administration to re-examine the application and, where the project complies with planning rules, to grant the authorisation. A point to watch: since the law on simplifying planning law of 26 November 2025, an informal appeal (recours gracieux), which must now be lodged within one month, no longer extends the time limit for bringing proceedings before the court. For decisions taken on or after 28 November 2025, you must apply directly to the court, or lodge both appeals at the same time.
The time limit for appealing a decision of an administrative court (tribunal administratif) is two months from notification of the judgment. This time limit is only 15 days if the decision is an interim relief order (référé).
If the local authority wishes to change the purpose or use of the property within 5 years of its acquisition, it must inform the former owner and offer them priority to acquire it. If the former owner declines, the local authority must inform the ousted prospective buyer named in the declaration of intention to sell (déclaration d'intention d'aliéner), and offer them priority to acquire the property.
The right to compel purchase (droit de délaissement) is the right given to the owner of a property subject to a public utility easement (a reserved site in the local urban plan or PLU, an expropriation zone) to require the public authority to purchase the property. This right enables the owner to escape a deadlock caused by the public constraint weighing on their property. The authority then has one year in which to decide on the acquisition.
The carte communale (municipal land-use map) is the equivalent of the PLU (local urban plan) for small municipalities that have chosen not to adopt one. It defines the areas where building is permitted, as well as the public utility easements affecting land use.
The commercial pre-emption right is a tool available to municipalities to combat the decline of town centres and ensure that local shops are maintained. The purpose of this pre-emption right is therefore to maintain or reintroduce diversity in local economic activity.
The prior declaration of works (déclaration préalable de travaux) is a planning authorisation that must be obtained before smaller-scale works begin. It is less demanding than a building permit and covers less significant construction and works. This declaration is mandatory and largely shares the procedural requirements of the building permit.
A building permit is a planning authorisation that must, in most cases, be obtained before works begin, whether to build, demolish or alter a structure, regardless of the type of owner or structure. It generally concerns new constructions and major alterations to existing buildings.
The SCOT (Schéma de cohérence territoriale, territorial coherence scheme) is a long-term strategic inter-municipal planning document covering an urban area or a large living or employment area. It incorporates all higher-level planning documents; PLUs, PLUis and cartes communales therefore refer directly to the SCOT.
Yes. If your property is located in a pre-emption zone (DPU), the municipality can take the place of the buyer when the Declaration of Intention to Sell (Déclaration d'Intention d'Aliéner, DIA) is signed. However, this decision must be strictly justified by a genuine development project in the general interest. We can assist you in challenging the lawfulness of the pre-emption or in negotiating the sale price before the expropriation judge.
A relay antenna requires a prior declaration where its footprint and floor area exceed 5 m² but do not exceed 20 m². A building permit is required if the antenna's footprint or floor area exceeds 20 m², or if the antenna is located within the boundaries of remarkable heritage sites (sites patrimoniaux remarquables) or in the vicinity of historic monuments and listed sites.
Before submitting an application, our firm carries out a thorough audit of your project against the rules of the Local Urban Plan (PLU) (zoning, height, footprint, parking). We can also apply for a planning certificate (certificat d'urbanisme, either detailed or informational) to freeze the rules applicable to your land.
Display on the site is mandatory whatever the operation, and whether the permit was granted expressly or tacitly. It takes the form of a rectangular sign visible from the public road, the content of which is set by the French Planning Code: identity of the beneficiary, date and number of the permit, nature of the project, area of the land, authorised floor area, height of the building, address of the town hall where the file can be consulted, and details of the means and time limits for challenging it. What is at stake is triggering the time limit for third-party challenges, which runs from the first day of a continuous two-month display period. Incomplete or interrupted display does not start that time limit running and leaves the project exposed to a late challenge: it is strongly advisable to have a commissaire de justice (judicial officer) draw up official reports at the beginning, during and at the end of the period.
Third parties have two months from the first day of a continuous two-month period of proper display of the sign on the site. Where the display was irregular or did not take place, this time limit does not run: a challenge remains possible for six months from completion of the works. Two points are decisive in practice. The challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being lodged, failing which it will be inadmissible. And, for decisions taken on or after 28 November 2025, a request for reconsideration (recours gracieux) no longer extends the time limit for bringing court proceedings: you must therefore not wait for the town hall's response before applying to the administrative court.
The right of pre-emption is the power given to a local authority (or to a dedicated body) to acquire, as a priority and within certain previously defined areas, property being disposed of, with a view to carrying out operations in the public interest.
Using an architect is the rule for any building permit application. The only notable exemption applies to individuals who build, or have built, for themselves a building whose floor area does not exceed 150 m², a threshold raised to 800 m² for agricultural buildings. A point often overlooked: this exemption does not apply to legal entities. A property holding company (SCI), including a family one, a property development company or a local authority must use an architect whatever the size of the project, failing which the application will be inadmissible.
It depends on the area created and the location of the land. A conservatory is an extension: in an urban zone of a municipality covered by a PLU (local urban development plan), a prior declaration is sufficient up to 40 m² of floor area or footprint, and a building permit becomes mandatory above that. Everywhere else, the threshold is lowered to 20 m². Please note: in an urban zone, a building permit is again required from 20 m² where the extension brings the total floor area of the building above 150 m².
It depends on the size of the garage and its location. If it is attached to the existing building, it is an extension: prior declaration up to 40 m² in an urban zone of a municipality covered by a PLU, up to 20 m² elsewhere, and a building permit above that. If it is a detached garage, it is a new construction: no formalities up to 5 m², prior declaration from 5 to 20 m², building permit above 20 m². In an urban zone, a building permit is also required from 20 m² if the works bring the total floor area above 150 m².
Converting an attic is only subject to authorisation if it creates floor area or alters the external appearance of the building, for example by adding a roof window or a dormer. Where this is the case, a prior declaration is sufficient up to 40 m² of floor area created in an urban zone of a municipality covered by a PLU, and up to 20 m² elsewhere; above that, a building permit is required. In an urban zone, a building permit is also required from 20 m² if the works bring the total floor area of the building above 150 m².
Filing the application is free: the town hall does not charge any processing fee. The real cost of a building permit lies in three items. First, planning taxes, chief among them the development tax (taxe d'aménagement), assessed on the taxable area using a flat-rate value per square metre revised each year, to which the rates voted by the municipality and the département apply; in Île-de-France, an office, retail or warehouse project is also subject to the charge for the creation of premises (redevance pour création de locaux). Second, design and project management fees, which vary according to the nature and complexity of the project. Finally, where applicable, the preventive archaeology levy. These items must be costed from the outset in the development appraisal: the development tax often represents an amount out of all proportion to the application costs.
The local urban development plan (Plan local d'urbanisme, PLU) sets the planning and building rules by dividing the territory into plots and zones with distinct legal regimes. For each plot, it shows the applicable planning rules as well as easements, access to utility networks and to the public road, and whether or not the plot can be built on.
No, in most cases. A pool with a surface area of 10 m² or less is exempt from any formalities, except in a protected area. Between 10 m² and 100 m², a prior declaration is sufficient. A building permit is only required for a pool of more than 100 m². It is also required, whatever the surface area of the pool, where the pool is covered by a shelter more than 1.80 metres high. These thresholds do not exempt the project from complying with the PLU, which may lay down its own rules on siting, setbacks and footprint.
A change of designated use requires, at a minimum, a prior declaration. If the accompanying works alter the load-bearing structures or the façade of the building, a building permit is required. Two useful points. The French Planning Code distinguishes five uses and twenty sub-uses: moving from one sub-use to another within the same use is not, in itself, a change of use requiring authorisation, although the PLU may regulate it. In addition, certain changes of use are subject to a binding opinion, in particular that of the CDPENAF (commission for the preservation of natural, agricultural and forest areas) for a building located in an agricultural zone.
The owner and the ousted buyer may attempt to challenge the pre-emption decision. Before bringing litigation, it is possible to lodge a prior informal appeal (recours gracieux) with the holder of the pre-emption right within 2 months of notification of the decision. If the informal appeal is rejected by the holder, a contentious appeal must then be lodged with the administrative court within 2 months.

As soon as a permit is posted on site, the countdown begins: the deadline for third-party appeals runs from the first day of a continuous two-month period of posting. Whether you are defending your authorisation or challenging a neighbour's, in Gironde or around the Arcachon Bay, consult us before it expires.