Development and construction projects in Guadeloupe and Martinique face increasingly complex regulations. Between the specific features of the loi Littoral (Coastal Act), the constraints linked to natural hazards (natural risk prevention plans, PPRN), in particular cyclone and flood risks, and the requirements of the energy transition in Non-Interconnected Zones (ZNI), which also concern La Réunion and Mayotte, public law rules can become a genuine obstacle course for project developers and local authorities.
NOVLAW Avocats (Laurent Bidault and his team) brings its technical expertise to project owners, developers and local authorities in the French overseas territories. Our geographical distance is our strength: it guarantees complete independence and an objective, rigorous analysis of your matters.
Thanks to the digitalisation of exchanges, and sometimes of administrative procedures, we act before the Tribunal administratif de Basse-Terre, the Tribunal administratif de Fort-de-France and the Tribunal administratif de Guyane (the administrative courts of Guadeloupe, Martinique and French Guiana) as effectively as for our clients in mainland France.
Master the regulatory feasibility of your property and construction projects.
Obtaining and securing planning permissions (building permits, development permits, prior declarations, environmental authorisations, classified installations) is the cornerstone of any property project and of any network or transport infrastructure project.
We act at every stage of your project's life cycle:

Maximise your chances of success and secure the financial and technical performance of public contracts.
For construction companies and service providers, access to public contracts in Guadeloupe, Martinique or French Guiana is vital.
For public buyers (municipalities, inter-municipal bodies or EPCI), legal certainty is imperative.
In this context, our firm acts mainly in the following areas:
Learn more: NOVLAW Avocats: Project management assistance (AMO) lawyer
Supporting the energy and digital transition of island territories.
The French Caribbean territories are pilot areas for renewable energy.
We advise energy project developers, whether on solar (photovoltaic), wind or biomass (anaerobic digestion unit) projects, and also on digital projects (data centres, telecommunications installations), on the specific regulatory aspects:
Learn more: Energy and infrastructure lawyer : NOVLAW AVOCATS: a partner in the energy transition and the reindustrialisation of France
How do we work effectively across a distance of 7,000 km?
Although most matters are handled remotely using digital tools, our lawyers can travel for major strategy meetings, on-site court-appointed expert assessments or particularly sensitive hearings where being there in person adds value.
The time limit for lodging an appeal on points of law (pourvoi en cassation) against a judgment of an Administrative Court of Appeal is two months from notification of the court's decision. However, this time limit is reduced to 15 days where the case concerns summary proceedings (référé).
A building permit is challenged before the administrative court, by means of an application for judicial review (recours pour excès de pouvoir), within two months from the first day of a continuous two-month period during which the notice has been properly displayed on the site. If the notice was displayed irregularly or not at all, a challenge remains possible for six months from completion of the works. Two admissibility conditions must be met: the applicant must demonstrate standing, i.e. a direct impact on the conditions of occupation, use or enjoyment of their property; and the challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being filed, by registered letter with acknowledgement of receipt. An informal appeal (recours gracieux) to the mayor remains possible, within one month, but it no longer extends the time limit for bringing proceedings for decisions taken on or after 28 November 2025 (Article L. 600-12-2 of the French Planning Code, introduced by the law on simplifying planning law of 26 November 2025). You should therefore not wait for the town hall's response before applying to the court. An application for suspension (référé-suspension) may be brought alongside the action on the merits to have the works halted.
Third parties with standing, such as neighbours or associations, have two months from the first day of a continuous period of proper display of the notice on the site to apply to the administrative court. Two procedural rules determine admissibility: the challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being filed, and standing must be established in detail. A decisive strategic point: since the law on simplifying planning law of 26 November 2025, an informal appeal (recours gracieux) no longer extends the time limit for bringing proceedings before the court for decisions taken on or after 28 November 2025. Waiting for the town hall's response therefore exposes you to the risk of being time-barred. Alongside the action on the merits, an application for suspension (référé-suspension) can be made to have the works halted.
Any refusal must state its legal and factual grounds. The first step is to analyse those grounds to determine whether they can be challenged in law or whether they reveal an obstacle that could be removed by amending the project. An application for judicial review (recours pour excès de pouvoir) must be lodged with the administrative court within two months of notification of the refusal. If the refusal is annulled, the court may order the administration to re-examine the application and, where the project complies with planning rules, to grant the authorisation. A point to watch: since the law on simplifying planning law of 26 November 2025, an informal appeal (recours gracieux), which must now be lodged within one month, no longer extends the time limit for bringing proceedings before the court. For decisions taken on or after 28 November 2025, you must apply directly to the court, or lodge both appeals at the same time.
The time limit for appealing a decision of an administrative court (tribunal administratif) is two months from notification of the judgment. This time limit is only 15 days if the decision is an interim relief order (référé).
If the local authority wishes to change the purpose or use of the property within 5 years of its acquisition, it must inform the former owner and offer them priority to acquire it. If the former owner declines, the local authority must inform the ousted prospective buyer named in the declaration of intention to sell (déclaration d'intention d'aliéner), and offer them priority to acquire the property.
The right to compel purchase (droit de délaissement) is the right given to the owner of a property subject to a public utility easement (a reserved site in the local urban plan or PLU, an expropriation zone) to require the public authority to purchase the property. This right enables the owner to escape a deadlock caused by the public constraint weighing on their property. The authority then has one year in which to decide on the acquisition.
The carte communale (municipal land-use map) is the equivalent of the PLU (local urban plan) for small municipalities that have chosen not to adopt one. It defines the areas where building is permitted, as well as the public utility easements affecting land use.
The commercial pre-emption right is a tool available to municipalities to combat the decline of town centres and ensure that local shops are maintained. The purpose of this pre-emption right is therefore to maintain or reintroduce diversity in local economic activity.
The prior declaration of works (déclaration préalable de travaux) is a planning authorisation that must be obtained before smaller-scale works begin. It is less demanding than a building permit and covers less significant construction and works. This declaration is mandatory and largely shares the procedural requirements of the building permit.
A building permit is a planning authorisation that must, in most cases, be obtained before works begin, whether to build, demolish or alter a structure, regardless of the type of owner or structure. It generally concerns new constructions and major alterations to existing buildings.
The SCOT (Schéma de cohérence territoriale, territorial coherence scheme) is a long-term strategic inter-municipal planning document covering an urban area or a large living or employment area. It incorporates all higher-level planning documents; PLUs, PLUis and cartes communales therefore refer directly to the SCOT.
Yes. If your property is located in a pre-emption zone (DPU), the municipality can take the place of the buyer when the Declaration of Intention to Sell (Déclaration d'Intention d'Aliéner, DIA) is signed. However, this decision must be strictly justified by a genuine development project in the general interest. We can assist you in challenging the lawfulness of the pre-emption or in negotiating the sale price before the expropriation judge.
A relay antenna requires a prior declaration where its footprint and floor area exceed 5 m² but do not exceed 20 m². A building permit is required if the antenna's footprint or floor area exceeds 20 m², or if the antenna is located within the boundaries of remarkable heritage sites (sites patrimoniaux remarquables) or in the vicinity of historic monuments and listed sites.
Before submitting an application, our firm carries out a thorough audit of your project against the rules of the Local Urban Plan (PLU) (zoning, height, footprint, parking). We can also apply for a planning certificate (certificat d'urbanisme, either detailed or informational) to freeze the rules applicable to your land.
Display on the site is mandatory whatever the operation, and whether the permit was granted expressly or tacitly. It takes the form of a rectangular sign visible from the public road, the content of which is set by the French Planning Code: identity of the beneficiary, date and number of the permit, nature of the project, area of the land, authorised floor area, height of the building, address of the town hall where the file can be consulted, and details of the means and time limits for challenging it. What is at stake is triggering the time limit for third-party challenges, which runs from the first day of a continuous two-month display period. Incomplete or interrupted display does not start that time limit running and leaves the project exposed to a late challenge: it is strongly advisable to have a commissaire de justice (judicial officer) draw up official reports at the beginning, during and at the end of the period.
Third parties have two months from the first day of a continuous two-month period of proper display of the sign on the site. Where the display was irregular or did not take place, this time limit does not run: a challenge remains possible for six months from completion of the works. Two points are decisive in practice. The challenge must be notified to the author of the decision and to its beneficiary within fifteen days of being lodged, failing which it will be inadmissible. And, for decisions taken on or after 28 November 2025, a request for reconsideration (recours gracieux) no longer extends the time limit for bringing court proceedings: you must therefore not wait for the town hall's response before applying to the administrative court.
The right of pre-emption is the power given to a local authority (or to a dedicated body) to acquire, as a priority and within certain previously defined areas, property being disposed of, with a view to carrying out operations in the public interest.
Using an architect is the rule for any building permit application. The only notable exemption applies to individuals who build, or have built, for themselves a building whose floor area does not exceed 150 m², a threshold raised to 800 m² for agricultural buildings. A point often overlooked: this exemption does not apply to legal entities. A property holding company (SCI), including a family one, a property development company or a local authority must use an architect whatever the size of the project, failing which the application will be inadmissible.
It depends on the area created and the location of the land. A conservatory is an extension: in an urban zone of a municipality covered by a PLU (local urban development plan), a prior declaration is sufficient up to 40 m² of floor area or footprint, and a building permit becomes mandatory above that. Everywhere else, the threshold is lowered to 20 m². Please note: in an urban zone, a building permit is again required from 20 m² where the extension brings the total floor area of the building above 150 m².
It depends on the size of the garage and its location. If it is attached to the existing building, it is an extension: prior declaration up to 40 m² in an urban zone of a municipality covered by a PLU, up to 20 m² elsewhere, and a building permit above that. If it is a detached garage, it is a new construction: no formalities up to 5 m², prior declaration from 5 to 20 m², building permit above 20 m². In an urban zone, a building permit is also required from 20 m² if the works bring the total floor area above 150 m².
Converting an attic is only subject to authorisation if it creates floor area or alters the external appearance of the building, for example by adding a roof window or a dormer. Where this is the case, a prior declaration is sufficient up to 40 m² of floor area created in an urban zone of a municipality covered by a PLU, and up to 20 m² elsewhere; above that, a building permit is required. In an urban zone, a building permit is also required from 20 m² if the works bring the total floor area of the building above 150 m².
Filing the application is free: the town hall does not charge any processing fee. The real cost of a building permit lies in three items. First, planning taxes, chief among them the development tax (taxe d'aménagement), assessed on the taxable area using a flat-rate value per square metre revised each year, to which the rates voted by the municipality and the département apply; in Île-de-France, an office, retail or warehouse project is also subject to the charge for the creation of premises (redevance pour création de locaux). Second, design and project management fees, which vary according to the nature and complexity of the project. Finally, where applicable, the preventive archaeology levy. These items must be costed from the outset in the development appraisal: the development tax often represents an amount out of all proportion to the application costs.
The local urban development plan (Plan local d'urbanisme, PLU) sets the planning and building rules by dividing the territory into plots and zones with distinct legal regimes. For each plot, it shows the applicable planning rules as well as easements, access to utility networks and to the public road, and whether or not the plot can be built on.
No, in most cases. A pool with a surface area of 10 m² or less is exempt from any formalities, except in a protected area. Between 10 m² and 100 m², a prior declaration is sufficient. A building permit is only required for a pool of more than 100 m². It is also required, whatever the surface area of the pool, where the pool is covered by a shelter more than 1.80 metres high. These thresholds do not exempt the project from complying with the PLU, which may lay down its own rules on siting, setbacks and footprint.
A change of designated use requires, at a minimum, a prior declaration. If the accompanying works alter the load-bearing structures or the façade of the building, a building permit is required. Two useful points. The French Planning Code distinguishes five uses and twenty sub-uses: moving from one sub-use to another within the same use is not, in itself, a change of use requiring authorisation, although the PLU may regulate it. In addition, certain changes of use are subject to a binding opinion, in particular that of the CDPENAF (commission for the preservation of natural, agricultural and forest areas) for a building located in an agricultural zone.
The owner and the ousted buyer may attempt to challenge the pre-emption decision. Before bringing litigation, it is possible to lodge a prior informal appeal (recours gracieux) with the holder of the pre-emption right within 2 months of notification of the decision. If the informal appeal is rejected by the holder, a contentious appeal must then be lodged with the administrative court within 2 months.

The third-party appeal period runs from the first day of a continuous two-month period during which the permit is posted on site. In the French Caribbean as in French Guiana, distance does not suspend any time limit. The firm works on the file and by video conference: consult us as soon as you are notified.